Project >
Technical Areas Two wastewater treatment plants and advancement lines : The wastewater drainage networks of the base are connected to advancement centers on a gravity basis and then transmitted to two biological treatment systems with a capcity of each 6,000 people/day in coercivi manner. The water treated in the biological traetment facilities are utilized for the irrigation purposes. Maintenance repair/ workshop and warehouse buildings: They consist of the construction workshop , carpenter’s workshop , steel and installation shop for the work areas engaged by the troops peforming the repairs of the buildings and facilities within the base , and two buildings including depots for these shops ands others use as techniccal offices. | ||||||||||||||||||
|