Ankara Gölbaşı Special Forces
Marmaris Aksaz Military Houses
Hospitals
Eskişehir Air Forces
Waste Water Treatment Plant
Harbors and Docs
Roads and Underpasses
Other Works

Technical Areas

Two wastewater treatment plants and advancement lines : The wastewater drainage networks of the base are connected to advancement centers on a gravity basis and then transmitted to two biological treatment systems with a capcity of each 6,000 people/day in coercivi manner. The water treated in the biological traetment facilities are utilized for the irrigation purposes. Maintenance repair/ workshop and warehouse buildings: They consist of the construction workshop , carpenter’s workshop , steel and installation shop for the work areas engaged by the troops peforming the repairs of the buildings and facilities within the base , and two buildings including depots for these shops ands others use as techniccal offices.